Skip to content

Specifications

Models: Mango Power S and Mango Power S Pro (US). See Overview for product description. European ratings are in User Manual (EU).

Parameter Mango Power S Mango Power S Pro
Commonly used module power (W) 320-540+ 400-670+
Maximum input voltage (V) 60 60
MPPT voltage range (V) 16-60 16-60
Peak Power MPPT voltage range (V) 36-55 36-55
Start-up voltage (V) 22 22
Maximum input current (A) 16 16
Maximum input short circuit current (A) 25 25
Number of MPPTs 1 1
Number of inputs per MPPT 1 1
Parameter Mango Power S Mango Power S Pro
Nominal output power (VA) 400 500
Maximum continuous output current (A) 1.67/1.92 2.08/2.40
Nominal output voltage/range (V)*1 240(L-L)/211-264; 208(L-L)/183-228 240(L-L)/211-264; 208(L-L)/183-228
Nominal frequency/range (Hz) 60/55-65 60/55-65
Power factor setting 0.99 0.99
Power factor (adjustable) 0.8 leading – 0.8 lagging 0.8 leading – 0.8 lagging
Total harmonic distortion <3% <3%
Maximum units per branch (12AWG)*2 9 7
Maximum units per branch (10AWG)*3 13 11
Parameter Mango Power S Mango Power S Pro
CEC efficiency 97% 97%
Night power consumption (mW) <50 <50
Parameter Mango Power S Mango Power S Pro
Operating temperature range (°C) -40 to +65 -40 to +65
Storage temperature range (°C) -40 to +85 -40 to +85
Dimensions (L × W × H) [mm] 221.5 × 129.0 × 32.5 221.5 × 129.0 × 32.5
Weight [without bracket] (kg) 1.2 1.2
Enclosure rating NEMA Type 6P / IP68 NEMA Type 6P / IP68
Cooling Natural convection Natural convection
Pollution degree III III
Enclosure protection class Class II double-insulated Class II double-insulated
Altitude (m) 4000 (<13123 ft) 4000 (<13123 ft)
Noise (dB) <25 <25
Parameter Value
Communication Wi-Fi
Indicator 1 x LED
Warranty 25 years
Grid Compliance UL 1741:2023, UL 1741 SA:2021, UL 1741 SB:2021, CSA C22.2 No. 107.1:2021, IEEE 1547:2018, IEEE 1547.1:2020, HECO SRD 2.0, FCC Part 15 Class B, IEC/EN 61000-6-1/-2/-3/-4, IEC/EN IEC 61000-3-2/-3. This product is UL Listed as PV rapid shutdown equipment and conforms with NEC 2014, NEC 2017, NEC 2020, NEC 2023 Section 690.12, CEC 2021 Section 64-218 rapid shutdown of PV systems for AC and DC conductors.

*1 Nominal voltage range can be configured if required by the utility. For interconnection to system voltages other than 208Y VAC three-phase, a transformer is required to connect to the grid.

*2/*3 The maximum number of modules per branch is only a recommended value; the actual number must be determined based on local regulations.

Product datasheet (PDF)